Search history
Clear allSearch by image
XDrag and drop an image here or upload an image
Max 5MB per image
UploadSign In | Join
X Email Mobile
Price Negotiable
A new item has been added to your Shopping Cart. You now have items in your Shopping Cart.
GuangZhou MeiBo Stage Lighting Equipment Factory 12yr.
Contacts:梁小姐Chat
Mobile:86-13868967792
E-mail:
Please read this manual carefully before operating the device.
USER MANUAL FOR DRY ICE MACHINE
Please read this manual before using the machine.
Please read this manual carefully before operating the machine.
Thank you for purchasing our product. Please kindly read the following instructions.
Please operate the machine carefully and strictly in accordance with the instructions for better operation and your safety. In case of any body injury or damage to the unit, please stop using the machine immediately and seek professional help.
1. Panel Layout
As picture below:
1.Fan-switch for fan
2.WATER SHORTAGE - indicator for water shortage
3.电源指示器
4.HEATUP I- 指示器 用于加热管道 I
5.HEATUP II-indicator for heating Pipe II
6.THRMOMETER - showing the temperature of the water tank
7.POWERINPUT - 输入电源
8.POWERINPUT-switch for main power supply (Leakage Protection Switch)
9.HEATUP I-switch for heating pipe I
10.HEATUP II-switch for heating pipe II
11.THERMOSAT-preset knob for increasing temperature of water tank
2. Operation
Preparation
Please kindly read the text below according to the panel picture.
1.Open the upper cover of the machine, pour water into the water tank till it's 16 meters deep.
2.Preset
to 80-90°C
3.Electrify ⑦ (220V)
4.Set ⑧ ON, turn on the main power, then ③ is ON.
5.Turn ⑨ ON, electrify the heating pipe I (2KW each), then ④ is ON.
6. Set ⑩ON, electrify heating pipe II (according to the power supply), then ⑤is ON.
6.Waiting for the water to get hot.
7.In about 30 minutes, check the ⑥, if it shows the temperature is 80-90℃, and ④⑤ are OFF, then the preparation is done.
(2)Spray Fog
1. Open the cover of the machine, put the dry ice into the hot water.
3. Warning
(1) The input of the power supply must be connected to the ground, otherwise, the leakage protection won't work.
2. Set 1 ON, then the machine will spray the fog.
(2) You must pour enough water into the water tank before electrifying, otherwise, the machine won't work because of water-shortage protection.
4. 技术参数
(1) Voltage: AC 220V 50~60Hz
(2) Power: 2000W+2000W
(3) Warm-up Time: 30 minutes
(4)Spray Area: 150~200"㎡" is the symbol for square meters.
(5)Product Size: 87x46x60 (cm)
(6)Package Size: 91x57x72(cm)
(7) N.W.: 35kg
(8)Gross Weight: 50kg
Update time:
TOP