Welcome! Join free or Sign In

X Email Mobile

soup with short furnace the furnace boiler energy-saving furnace 中文版

 soup with short furnace the furnace boiler energy-saving furnace

 soup with short furnace the furnace boiler energy-saving furnace  soup with short furnace the furnace boiler energy-saving furnace  soup with short furnace the furnace boiler energy-saving furnace  soup with short furnace the furnace boiler energy-saving furnace
QR code0
[Scan the QR code, view in your mobilephone.]
  • Updated: 2016-03-27 12:44
  • About Product:Vertical combination gas furnace is the technical personnel of the company to absorb the advantages of similar products at home and abroad carefully design and manufacture of a new type of gas stove series, main products have made this product adopts full stainless steel enclosure design; appearance; using iron furnace head (baozi furnace adopts the luxury dish stove head), high efficiency and energy saving, durable; independent piezoelectric ignition configuration, valve comes with safety cut-out device to ensure user safety. Quality better price more affordable phone 18257929263 8657989355500
EXW Price: Price Negotiable
The price for this item is to be negotiated. Please contact supplier for further information.
Send Inquiry
Contact
Main
Products:
Food processing machinery,food equipment,kitchen equipment,beverage machine,ice cream machine,snow machine,refrigerator,freezer,ice machine,buffet table
Contacts: Cai taoyingChat
Mobile: 86-18072684810
E-mail: 292464650@qq.com
WeChat: avelyncai
Address: 21131 , 2 F, Yiwu Production Material Market.


better quality, better service!!!
details please consult: landline: 0579 -89355500
phone: 18257926263


product information:

1. The vertical design of the overall and unified space saving.
3. Cast iron furnace head, disc type luxury type burner can be separated easily from the furnace body, furnace head easily cleaning residue;
4 the use of high quality stainless steel manufacturing, sealing good, do not omit the food residue, with the safety of the thermocouple wire, to ensure the safety of users;
5 adjustable high quality stainless steel foot seat
6 valve with high quality copper valve with safety device and thermocouple, can prevent leakage, so as to avoid fire.
The 7 switch knob is used for gas insulation, bakelite die casting, heat energy.


products



products use

The machine operation rules low noise, high efficiency, compact structure, flexible operation, simple, and uniform surface, maintenance convenient characteristics

1. stirring first flour into barrels, adding 50 water mixing, stirring for about 5 minutes and good namely, such as dough and auger together, scatter some dry flour can be eliminated. The normal operation of the machine work, auger to should belt shield arrow point is consistent. Note: when the machine is running, is prohibited in the!

After taking the surface and good surface of the 2., broken open power, open the machine cover, drew the bolt . The barrel surface pull 90 degrees, insert latches fixed barrel surface, from the surface. Dough is too large, can be cut into pieces of dough by knife. If the dough surface at the bottom of the barrel can not be removed, will take out the dough surface can be reversed.

maintenance procedure:

1. often check all parts of fasteners in use, such as loose fastening timely;

2. the machine gear meshing zone adopts grease lubrication, every half moon refueling time, bearing seat has powder metallurgy bearing, each class must be to the bearing seat of the oil cup oil twice, or shaft and bearing glue together the consequences

& lt; span style = "color:#333333; font-family:arialspan style =" color:#333333; font-family:arial, Verdana; font size: 14px; line-height:20px; background-color:#FFFFFF; "& gt; meshing zone with grease lubrication, every half moon refueling time, bearing seat has powder metallurgy bearing, each class must be to the bearing seat of the oil cup oil twice, or shaft and bearing scuffing consequences conceited

3. and when the amount of flour should not exceed the surface of bucket capacity, so as not to burn motor ;

4. found the dough with oil, should be timely maintenance, replacement of oil .


Qing : wash

1. machine after use should be cleaned promptly, so as not to affect the use of again;

2. cleaning barrel surface water height should not axis more than the lowest, in order to prevent the water from the barrel surface side of the shaft hole overflow or inflow side plate laminated influence use of life;

3. this machine is drip proof type appliances, prohibit the use of spray cleaning pipe.

Customers need to know
shopping


1 equipment should be placed in a stable place, back wall 10cm above the left and right sides of the 10cm above, and the equipment should be installed in a good ventilation environment, the switch can not be stacked debris, easy to operate;
2 all operators must strictly comply with the gas operation specification, in the use of the confirmation of the gas supply and product connection is firm and reliable and confirm the interface without gas leakage, the valve switch in the closed state;
3. All operations can only be used to ensure the safety of the situation, in order to use the furnace, such as failure, must immediately repair;
4. Must be after correct installation and commissioning before commissioning, only can happen only in testing the equipment and to ensure correct operation. A quick cut off gas supply valve must be installed prior to the installation of the machine and must be located near the upper reaches of the machine.
5 machine connected pipe must be connected with the suitable pipe.
6 after the connection, use the soap water test or test the pipe connection with the testing instrument to test whether there is a leak!!! "
7. Repairing gas, Hong furnace installation must be performed by professionals. In case of gas leaks, should immediately close the valve and keep environment ventilated prohibiting all power switches and ignition. To be confirmed and then cleared of combustible gas leakage repair.
1. 5 guarantee
The company shall be used only for cooking food, and the company shall not be responsible for any damage to any other use. The following circumstances do not belong to the scope of the warranty:
-- because of the use of improper or not according to the design intent of the use of the machine;
- incorrect installation or maintenance;
- to continue to use the equipment in the case of component damage;
- without the written permission of the dealer to replace part of the case;
Install
2. 1 gas installation
1. Before installation, the valve is placed in the closed state;
2. The use of gas source for liquefied petroleum gas, and the connection between the device is firm and reliable;
3. Prohibition of high air valve used in the furnace.
3. Operation
3. 2 operation
] the knob from the closed state, press the inverse clockwise rotation to "]" position, pinned down the knob, and then use the gun, the small fire burner (fire). Then press the knob down for 20 seconds and **** watch a small fire burner (flame) is lit. When the knob is released, low heat burner (spark) must be lit; if you do not ignite, repeat, until definitely lit up. Such as stoves disabled too long or use it for the first time, may spark time slightly longer (about two to three minutes), which belongs to the normal phenomenon.
] when lit a small fire burner (fire), and then the knob counter clockwise direction of rotation to the maximum flame position, "00" is the largest fire, to ignite the main burner, will be able to use. If you want the flame to be set to a minimum, the counter clockwise
Rotate to the minimum flame position, "0" as the minimum flame. )
After using], close the main burner: the knob from the maximum flame or minimum flame position rotation to "]" position, for the closure of the main burner.
You shut down small fire burner (fire): the knob rotates from "]" position to "]" position, for the closure of the small fire burner.
Please do not use this machine, please quickly cut off the gas supply valve is closed.
4. Cleaning and maintenance
1. In the cleaning and maintenance, should shut down the furnace button, to prevent accidental accident;
2. Work every day, and take a pot, and then rinse with water;
3. Then, with a wet towel to wipe the furnace body and the furnace, is strictly prohibited the use of water directly to wash the body surface, so as not to damage the equipment performance;
4. Clean up, put all the accessories on the furnace body with dust paper.
5. Handling and storage
In handling process, the product should handle with care, to prevent violent vibration; packaged products should not long-term open storage, should be placed in a well ventilated, non corrosive gases in the warehouse, not inverted. The need for temporary storage, water-resistant measures should be taken.
6, random accessories: playing a gun, a manual, certificate







Tel:


Telephone: 0579 --89355500

cell phone: 13989432700

URL for the Email:avelyn.cai@hotmail.com
SKYPE:avelyn.cai.hotmail.com
: www.dreamdar.cn

Love me Q me Love me Q me Love me Q me

map


Click To Contact Yiwugo's Partner To Get Trade Service
©2024 Yiwugo.com All rights reserved.
Finding high quality products in Yiwu China, Yiwu China Commodity Market (Yiwu wholesale market), the World's Largest Commodities Trading Center Online.
TEL: +86-579-81530000 FAX: 86-579-85188202 网站备案号:浙ICP备15028362号-7

TOP

Items have been added to the Inquiry Basket

There are items in the inquiry basket

Continue shopping Send Inquiry