X Email Mobile
EXW Price: |
The price for this item is to be negotiated. Please contact supplier for further information.
|
Yuehao Auto Accessories 13yr. |
|
Main Products: |
automotive products,mobile phone holder,car charger,cigarette lighter points in,drink holder,ashtrays,antenna,car mirror,vacuum cleaners,inflatable pump |
Contacts: | 蒋俊倩Chat |
Mobile: | 86-18067645559 |
E-mail: | 903969405@qq.com |
WeChat: | 18067645559 |
Address: | 68969 , 1 Street, 4 F, 107 Gate, International Trade Mart (District 5). |
Brand: - | Material: PP | Origin: Yiwu |
Custom processing | Size: Figure | Applicable models: General |
Installation type: adhesive | Packing quantity: 2 | Color: black and white |
[Specification]
Name: injection with bright rain gear
material: plastic material
number: 2 tablets
color: black transparent color
[products]
1. Material made of imported raw materials for injection molding.
2. Has high clarity, high temperature resistance, impact resistance, bending resistance, no discoloration characteristic.
3. Made sophisticated computer professional machines, to ensure compliance with the vehicle specifications.
shelter:
1: in any circumstances, can maintain the fresh air convection, guarantee car suitable for human.
2: due to security of fresh air convection, and not affect the vision and the operation of glass fogging, increase traffic safety.
3: sheltered side of the dazzling bright light and ultraviolet radiation, reduce the temperature inside the car, can shelter from the wind, snow, rain, sand into the car, does not affect the external air exchange.
[products]:
installation:
1 , before installing please to automobile rear mirror dust grease stains with a towel to wipe clean, keep dry, then use this product in the rearview mirror try about the installation position, after the confirmation of the torn glue 3M paste for installation.
2 ,
paste in order to ensure the 3M glue viscous please in fair weather or temperature of not less than 10 DEG C environment for installation.
3 , do not immediately after the installation of water, so as not to reduce the service life.
4 , after the installation of a good hand to press for a moment or in other ways to ensure the viscosity.
5 , winter installation, please use a hair dryer or a hot air blower to heat the 3m glue, make full use of its viscosity.
TOP
Items have been added to the Inquiry Basket
There are items in the inquiry basket