Welcome! Join free or Sign In

X Email Mobile

slump 中文版

slump

QR code0
[Scan the QR code, view in your mobilephone.]
  • Updated: 2022-01-14 10:58
  • About Product:Slump refers to concrete 's plasticizing and pumpable properties, Which are 2 measure of the degree (plasticizing and pumpable properties) by a policy index to determine been construction can be carried out normally. The influence of concrete slump Mainly includes grading change, water content, weighing deviation of crossbar, dosage of admixture, temperature of cement, etc. The Slump refers to the workability of concrete. Which is to ensure the normal construction, o water retention, fluidity and cohesion of concrete. The Workability means that the concrete mixture is easy to operate, mix, transport,
EXW Price: Price Negotiable
The price for this item is to be negotiated. Please contact supplier for further information.
Free Shipping QTY: 10pcs
Send Inquiry
Contact
Main
Products:
Lifting tools: electric hoist,hand hoist,lifting tackle,lifting jack,lifting hook,lifting belt,line tightener
Contacts: ZHang LiminChat
Mobile: 86-13305898899
E-mail: wgwj@yiwugou.com
WeChat: 13185184822
Address: 14367 , 12 Street, 2 F, 30 Gate, International Trade Mart (District 2).

Test procedures:
1. Wet slump cone and floor, no clear water on the inner wall and floor of slump cone. The bottom plate should be placed on a solid (non-absorbent) horizontal surface, and the barrel should be placed in the center of the bottom plate, and then the foot should be on the two-sided pedal. The slump cylinder should be kept in a fixed position when loading.

2. Divide the concrete sample obtained according to the requirements into three layers and load it into the cylinder evenly, so that the height of each layer is about one-third of the height of the cylinder after tamping. Use the tamper 25 times per layer.

3. Wipe the top of the cylinder with a small spatula, and remove the concrete on the bottom plate at the side of the cylinder. The lifting process of slump cone should be completed within 5-10s. The whole process from the beginning of loading to lifting the slump cone should be carried out continuously and should be completed within 150s.

4. After lifting the slump cylinder, measure the height difference between the height of the cylinder and the highest point of the concrete test body behind the slump, that is, the slump value of the concrete mixture.

5. Observe the adhesion and water retention of the concrete specimens behind the slump.

Click To Contact Yiwugo's Partner To Get Trade Service
©2024 Yiwugo.com All rights reserved.
Finding high quality products in Yiwu China, Yiwu China Commodity Market (Yiwu wholesale market), the World's Largest Commodities Trading Center Online.
TEL: +86-579-81530000 FAX: 86-579-85188202 网站备案号:浙ICP备15028362号-7

TOP

Items have been added to the Inquiry Basket

There are items in the inquiry basket

Continue shopping Send Inquiry