Welcome! Join free or Sign In

X Email Mobile

FUTAI DEYI shengshi luyuan white nail free glue kick line wood glue 5 stopwatch dry 中文版

FUTAI DEYI shengshi luyuan white nail free glue kick line wood glue 5 stopwatch dry

FUTAI DEYI shengshi luyuan white nail free glue kick line wood glue 5 stopwatch dry FUTAI DEYI shengshi luyuan white nail free glue kick line wood glue 5 stopwatch dry FUTAI DEYI shengshi luyuan white nail free glue kick line wood glue 5 stopwatch dry
QR code0
[Scan the QR code, view in your mobilephone.]
  • Updated: 2024-11-18 09:42
  • About Product:Construction procedure\nTo ensure product quality, it is recommended that customers clean the surface before use without dust or grease; No water or moisture; At the same time to ensure that one side is absorbent materials and solid, in order to ensure the paste effect.\n1) cut the nozzle above the thread line to reach the desired size and Angle (about 6mm);\n2) extrude one or two continuous strips of adhesive tape on the back to be pasted.\n3) glue the materials to be pasted for at least 2 minutes;\n4) wipe away the spilled glue with a wet cloth;\n5) according to different substrates, certain supports or fixings are still needed when gluing heavy objects together.\nDose meter
EXW Price:
Above 240pcs   CN ¥ 0.01 /pc
Send Inquiry
Contact
Main
Products:
glue 502 super glue,AB glue Epoxy glue,epoxy resin adhesive,gasket maker,rtv silicone sealant,White glue Wood glue,Mouse Rat glue traps,99 Contact Cement,PVC CPVC glue,Tire Tube glue
Contacts: LeonChat
Mobile: 86-13335982739
WhatsApp: +86 13335982739
E-mail: jingongadhesive@163.com
WeChat: 13335982739
Address: 15296 A, 5 Street, 2 F, 41 Gate, International Trade Mart (District 2).
Address: 义乌市廿三里工业区

Construction procedure

In order to ensure theThe quality of the product, customers are advised to clean the surface before use without dust or grease; No water or moisture; At the same time to ensure that one side is absorbent materials and solid, in order to ensure the paste effect.

1) cut the nozzle above the thread line to reach the desired size and Angle (about 6mm);

2) extrude one or two continuous strips of adhesive tape on the back to be pasted.

3) glue the materials to be pasted for at least 2 minutes;

4) wipe away the spilled glue with a wet cloth;

5) according to different substrates, certain supports or fixings are still needed when gluing heavy objects together.

Volume calculation

The rubber strip with a width of 6mm can be sized by about 10m;

Bonding time and strength: the final strength can be reached after 48 hours, but it may vary according to the actual situation;

Limitation: should not be used in damp and stagnant areas. Should not be used to install mirrors. Material can be used for PVC; But not for polyethylene and polypropylene. This product is not waterproof and should not be used outdoors.

Note: keep out of reach of children.

Preservation: store in a dry and cool environment (21 degrees plus or minus 3 degrees) to prevent frost;

Shelf life: 18 months;

Construction procedure

In order to ensure theThe quality of the product, customers are advised to clean the surface before use without dust or grease; No water or moisture; At the same time to ensure that one side is absorbent materials and solid, in order to ensure the paste effect.

1) cut the nozzle above the thread line to reach the desired size and Angle (about 6mm);

2) extrude one or two continuous strips of adhesive tape on the back to be pasted.

3) glue the materials to be pasted for at least 2 minutes;

4) wipe away the spilled glue with a wet cloth;

5) according to different substrates, certain supports or fixings are still needed when gluing heavy objects together.

Volume calculation

The rubber strip with a width of 6mm can be sized by about 10m;

Bonding time and strength: the final strength can be reached after 48 hours, but it may vary according to the actual situation;

Limitation: should not be used in damp and stagnant areas. Should not be used to install mirrors. Material can be used for PVC; But not for polyethylene and polypropylene. This product is not waterproof and should not be used outdoors.

Note: keep out of reach of children.

Preservation: store in a dry and cool environment (21 degrees plus or minus 3 degrees) to prevent frost;

Shelf life: 18 months;

The main purpose

1. Furniture manufacturing industry: adhesion of mercury lens, aluminum sealing edge, handle, crystal board, marble, board adhesion, etc.;

2,Adornment is decoratedIndustry: bonding and fixing all kinds of wood wire, door cover wire,Gesso line, floor tiles, various decorative pendants and various wallboard projects;

3. Exhibition industry: adhesion and fixationAll kinds of calligraphy and painting, signage, acrylic, exhibition GUI production and so on.

4,Ambry door plankIndustry: bonded crystal steel plate, etc.

This product is used for covering materials, wood, gypsum board, metal, mirror, glass, plastic, rubber, wallboard, shutter, threshold, windowsill, boundary pile, pillar, junction box, all kinds of artificial materials,Ornamental stonesImplement, ceramic tile is fixed on concrete, brick, plaster, wall and coarse board.

Directions for use

Clean the construction surface to ensure no oil or dust.

Cut the opening of the pipe, install the nozzle, and extrude with the sealing gun.

I. dry bonding method (suitable for joints with lighter materials and light bearing capacity)

1. Extrude several lines of \"zigzag\" liquid nails at a distance of 40cm;

2. Press one side of the nail with liquid on the adhesive and gently pull it apart to let the glue evaporate for 2~5 minutes;

3. Then press both sides together.

Ii. Wet bonding method (suitable for use with clamping tools only where the pressure is relatively high)

1. Apply the liquid nail according to the dry bonding method;

2, with clamp, nail or screw, immediately glue the two sides or nail;

3. After the glue solidifies (24 hours), remove the clamp.

Adhesion methods of load-bearing materials:

Can be directly bonded to the loading material. Glue the weight bearing material together first, then separate it, wait for drying for about 5 minutes, press and knock the material to be bonded firmly again to make it in place. Support may be provided by bracing when necessary. (heavy material must be supported)

Dry joint adhesion :(ceiling thread, kick thread, door frame, background wall)

1. Extrude \"zhi\" type adhesive along the adhesive surface

2. Push the adhesive side to the adhesive surface and press both sides tightly

3. Pull apart the two adhesive surfaces and let the liquid nail adhesive evaporate for 2-5 minutes

4.2-5 minutes later, press again and tap along the joint.

5. Temporarily fix the adhesive with auxiliary tools and cancel the auxiliary fixation 24 hours later.

6.the adhesive effect can be achieved within 24 hours, and the product can be completely cured within 2-3 days

Wet bonding :(wood floor,Marble countertopEquilarge material

1. Apply the liquid nail superglue according to the dry bonding method

2. Compress the adhesive surface, achieve the adhesive effect within 24 hours, and completely solidify within 2-3 days.

Quick adhesion liquid nail has super fast adhesion, especially in the multi-surface effect is more significant, as long as any surface is multi-empty structure, can achieve rapid adhesion effect, adhesion process without any auxiliary device.

Directions for use

Clean the construction surface to ensure no oil or dust.

Cut the opening of the pipe, install the nozzle, and extrude with the sealing gun.

I. dry bonding method (suitable for joints with lighter materials and light bearing capacity)

1. Extrude several lines of \"zigzag\" liquid nails at a distance of 40cm;

2. Press one side of the nail with liquid on the adhesive and gently pull it apart to let the glue evaporate for 2~5 minutes;

3. Then press both sides together.

Ii. Wet bonding method (suitable for use with clamping tools only where the pressure is relatively high)

1. Apply the liquid nail according to the dry bonding method;

2, with clamp, nail or screw, immediately glue the two sides or nail;

3. After the glue solidifies (24 hours), remove the clamp.

Adhesion methods of load-bearing materials:

Can be directly bonded to the loading material. Glue the weight bearing material together first, then separate it, wait for drying for about 5 minutes, press and knock the material to be bonded firmly again to make it in place. Support may be provided by bracing when necessary. (heavy material must be supported)

Dry joint adhesion :(ceiling thread, kick thread, door frame, background wall)

1. Extrude \"zhi\" type adhesive along the adhesive surface

2. Push the adhesive side to the adhesive surface and press both sides tightly

3. Pull apart the two adhesive surfaces and let the liquid nail adhesive evaporate for 2-5 minutes

4.2-5 minutes later, press again and tap along the joint.

5. Temporarily fix the adhesive with auxiliary tools and cancel the auxiliary fixation 24 hours later.

6.the adhesive effect can be achieved within 24 hours, and the product can be completely cured within 2-3 days

Wet bonding :(wood floor,Marble countertopEquilarge material

1. Apply the liquid nail superglue according to the dry bonding method

2. Compress the adhesive surface, achieve the adhesive effect within 24 hours, and completely solidify within 2-3 days.

Quick adhesion liquid nail has super fast adhesion, especially in the multi-surface effect is more significant, as long as any surface is multi-empty structure, can achieve rapid adhesion effect, adhesion process without any auxiliary device.

Click To Contact Yiwugo's Partner To Get Trade Service
©2024 Yiwugo.com All rights reserved.
Finding high quality products in Yiwu China, Yiwu China Commodity Market (Yiwu wholesale market), the World's Largest Commodities Trading Center Online.
TEL: +86-579-81530000 FAX: 86-579-85188202 网站备案号:浙ICP备15028362号-7

TOP

Items have been added to the Inquiry Basket

There are items in the inquiry basket

Continue shopping Send Inquiry