X Email Mobile
EXW Price: |
The price for this item is to be negotiated. Please contact supplier for further information.
|
义乌市力虎汽车用品有限公司 6yr. |
|
Main Products: |
The main products are automobile fabrics,automotive plastic decorative parts,automobile clothing,automotive LED lighting,automotive products,automotive LED lighting |
Contacts: | 徐冬英Chat |
Mobile: | 86- |
E-mail: | |
WeChat: | 13362914084 |
Address: | 69397 , 4 F, International Trade Mart (District 5). |
Address: | 义乌市稠江街道新科路E22号 双创街A区4幢 |
1. Vehicle cleaning set (5 pieces) : 31 yuan
Packing: PVC bag + Oxford cloth bag
Packing: 25 PCS
Specification: 1PC big 8 character sponge +
1PC tire brush +
1CP9 liter bucket +
1 PC towel
2. 4-piece towel set for vehicle cleaning: 40 yuan
Packing: packed in color
Packing: 25 PCS
Specification:1PC coral towel 42*38CM+
1PC coral towel 90*60CM+
1PC chenille + coral fleece car gloves 26*20CM+
1PC coral fleece + sponge sponge car block 20.5*13CM
Three, car wash set of 9:27 yuan
Packing: PVC bag + Oxford cloth bag
Packing: 25 PCS
Specification: 1PC tire brush: 5*4*29CM
1PC high-low wool gloves: 25.4*21CM
1PC8 type high and low foam block
3PC terry cloth wax block
3PC glass cloth/terry cloth/waffle
4. 4-piece vehicle cleaning set: 29 yuan
Packing: PVC bag
Packing: 25 PCS
Specification:2PC chenille + coral gloves
2PC coral pile + sandwich sponge car block 20*14*6CM
Five, Flexible dust brush:6 yuan
Packaging: opp bag
Packing: 100 PCS
Specification: telescopic length 27-76cm
Zhejiang province yiwu city label car supplies factory focus on automotive supplies for 13 years
Booth address: room 34484, 7th street, 2nd floor, gate 75, 4th district, yiwu international trade city, zhejiang
Factory address: no. 496, chengdian road, yiwu city, zhejiang province
Contact person: xu dongying
Consulting telephone: 13362914084 0579-85593690
Consulting QQ: 2355423787 2355423806
Shipping instructions
1. Express the small items and logistics the large ones.
2. By default, express delivery requires schentong and logistics to be paid at destination (logistics needs to be supported by local logistics outlets).
3. General transportation time: 3-5 days; If the goods do not arrive within 5 days after shipment, please inform me to check the list. Please do not rush the goods within 5 days. I think we are really busy. I hope you can understand.
If you need to go through the customs, please go through the customs formalities. I will take delivery of goods to the designated place!
TOP
Items have been added to the Inquiry Basket
There are items in the inquiry basket