● product features:
1. Sun protection, heat insulation, reflected light: The surface temperature can be reduced by less than 20 degrees when the sun is exposed in summer, and the indoor temperature of the workshop can be reduced by 6-12 degrees.
2. Water resistence and leak repairing anti-rust, anti-rain and acid, anti-corrosion, UV protection
3. Prevent roof aging, prolong the service life of colored steel tile factory building for more than 10 years, and have beautiful appearance. After the construction is completed, you can still move on the roof.
4. Effectively keep out the sound of rain, especially the steel frame workshop roof.
5. No need to replace the colored steel tile roof rust vulnerability.
6. Cold resistance, minus 40 degrees will not be affected, and the outer aluminum layer is fireproof and flame retardant.
● application scope:
Generally applicable to steel frame workshop roof and other buildings top insulation, water resistence and leak repairing, sound insulation, rust prevention, damage repair, aging renovation: it is currently a relatively high-quality insulation water resistence and leak repairing material. After installation, when exposed to the sun in summer, the indoor temperature can be reduced by 30%-40%, and the higher the temperature, the greater the cooling.
For more information, please contact Customer Service: WeChat with the same number; 15725773228
requirements for construction base operation conditions:
1. Colored steel tile the base surface is free of dust and looseness. G construction after loose part treatment
2. The base surface shall not contain water, dust or oil pollution. If there is a must deal with before construction.
3. When the gap of colored steel tile exceeds 0.3mm, it should be reinforced. Construction can be carried out only after handling.
4. Yin and Yang angle, the elevation of the pile is at the inner corner of the plane Yin angle and vertical elevation wall, and the gap should be treated.
5. Construction in the early morning. When there is dew on the colored steel tile side, the construction must be stopped.
6. During the construction of rusty color steel, the embroidery surface exceeds 50%, and rust removal is required on colored steel tile. (Heat-resistant 80°C, low temperature-40°C)
7. When the cement-based surface is connected, the cement-based surface is required to be firm and smooth, and the base surface treatment agent is brushed during construction.
Construction technology:
1. Clean the base surface:
Use mop bar to check the dust on colored steel tile. If there is rust, it must be removed to make it smooth and clean.
2. Make additional layers:
additional layers shall be made at Yin-Yang angle, vent, gutter, etc. The additional layers shall be 15cm30cm wide and extended along the central axis of Yin-Yang angle.
3. Large-area construction:
a: First Play the baseline, so that the coiled materials posted are neat and beautiful.
B: When laying coiled materials, align the square coiled materials at the part to be constructed and start paving from the downhill direction of flowing water. The vertical wall is paved from the lower direction to the upper direction of the elevation.
C: remove the air, press the air in the coiled material along with the rolling of the coiled material, and put the coiled material firmly.
D: on the colored steel tile nail cap, the tape can be cut into small pieces and pasted at the nail cap. Local construction can be used for repairing old roofs with partial leakage.
E: The lap side length of coiled material is 5cm
f: when the coiled material passes through the nail cap, it is not easy to pull the coiled material too tightly. Loosen the coiled material and try to make the coiled material on the nail cap free from too much force.
4: local construction
for local construction such as colored steel tile overlap, gutter, fan, light well, etc,
that is, use self-adhesive tape to stick all key parts such as colored steel tile overlapping parts of the roof, gutter, fan, light well, etc,
the tape can be cut into small pieces and pasted at the nail cap. Local construction can be used for repairing the old roof with partial leakage.
Precautions;
1. The roof must be free of dust and cleaned. The old roof can be scrubbed mop.
2. The thickness of coiled material is preferably 1.5mm or 2.0mm.
3. It is not suitable for construction in foggy days or when heavy rain begins to stop, moisture will produce bubbles.
4. Between coiled materials and coiled materials, the lap joint between coiled materials and reinforcing layers must be firm, and the phenomenon of curling cannot exist. Conditional projects can do water spraying experiments.
5. The waterproof layer that has just been constructed should not be uncovered at will, because the longer the bonding time is, the stronger the bonding effect will be. If it is uncovered for more than 2 times, there will be the phenomenon that the bonding is not firm, and the special base treatment must be applied to the bonding
6. The construction temperature shall not be lower than 5°C or higher than 35°C.