step a new house decoration:
1 Preliminary Design -- 2 main body disassembly and modification -- 3 hydropower transformation -- 4 carpentry -- 5 tiles -- 6 brush wall paint -- 7 kitchen and bathroom ceiling -- 8 cabinet installation -- 9 wooden door installation -- 10 floor installation -- 11 paving wallpaper -- 12 radiator installation -- 13 switch socket installation -- 14 lamp installation -- 15 hardware sanitary ware installation -- 16 curtain rod installation -- 17 pioneer cleaning -- 18 furniture entry -- 19 home appliance installation -- 20 home accessories
1. Preliminary design: it is mainly designed according to your living habits and makes a detailed measurement of your room. Don't be lazy, you 'd better measure it yourself, the contents of measurement mainly include:
define the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area, floor area;
specify the main wall size. Especially the wall size of furniture needs to be designed in the future.
2. Subject disassembly and modification
entering the construction stage, the main body demolition and renovation is the first project, mainly including wall removal, wall building, wall shovel, heating removal, plastic steel window replacement, etc. To put it bluntly, the main body is to put up the framework of the construction site first.
3. Hydropower transformation
before the transformation of the water circuit, the disassembly and modification of the main structure should be basically completed. Between the two links of water and electricity transformation and the main body disassembly and renovation, some students may know that the first measurement of cabinets should also be carried out. In fact, the first measurement of the so-called cabinet has no actual content, because the wall and ground are not handled, cabinet designers cannot give specific design dimensions, but only upper nozzle reserved by developers, the position of the Hood socket, put forward some relevant suggestions. Mainly includes:
see if the position of the Hood socket affects the installation of the hood in the future;
see if the position of the water meter is appropriate;
see if the upper nozzle position is convenient to install the sink later.
For the first measurement of the cabinet, students with a little experience can complete it by themselves. After the waterway transformation is completed, it is better to make the bathroom waterproof immediately. The kitchen generally does not need to be waterproof.
4. Carpentry
carpentry, bricklayer and oilman are the "Three Brothers" in the construction process. The basic order of appearance is: Wood-tile-oil. The basic principle of appearance is-whoever gets dirty comes first. "Who gets dirty first" is also one of the basic principles that determine the order of home decoration, which I will mention later.
In fact, carpentry work such as packaging riser, making decorative suspended ceiling, and sticking plaster line can also be considered as a detailed link of the main body disassembly and modification in a sense. It does not conflict with the water circuit transformation, sometimes some cooperation is needed.
5. Tile
during the "tile second child" operation, it also involves the installation of the following three links:
threshold stone. Installation of marble windowsill. The installation of threshold stone can be completed together with floor tile, or after floor tile. The installation of marble windowsill is usually done after window frame, and the workers who install marble will prepare silicon sealant, the marble and window frame were sealed with silicon sealant.
Installation of floor drain. Floor drain is the first part of home decoration hardware, because it should be installed together with floor tiles. Therefore, when students start to visit building materials, they should buy floor drain early.
Installation of range hood. The range hood is the first home appliance to appear. After the kitchen wall tiles are laid, you can consider installing the range hood.
The tile worker second child left the site. At this time, the cabinet can be measured for the second time. To be precise, after the kitchen wall tiles are pasted and the range hood is installed, the cabinet can be measured for the second time.
Brush wall paint
the "third oil worker" entered the site, mainly completing the basic treatment of the wall, painting the finishing paint, painting the furniture made by the "woodworking boss" and so on. Students who are going to paste wallpaper only need to ask the "third oil worker" to do basic treatment on the wall where the wallpaper is planned to be pasted. As for whether to leave the finishing paint for the last time, I personally feel that this problem is not necessary too real. From my experience of decoration, it is not very meaningful to leave the finishing paint once, because the following operations are no more dirty than painting.
7. Kitchen and bathroom ceiling
as the installation link, the cabinet ceiling is still continuing the "packaging" of the home ". At the same time as the kitchen and bathroom ceiling, the moisture-proof ceiling lamp and ventilating fan (bath heater) of the kitchen and bathroom should have been bought. Students had better install the kitchen and bathroom ceiling lamp and ventilating fan (bath heater) at the same time, or leave thread ends and holes.
8. Kitchen cabinet installation
after the ceiling is finished, the cabinet can be installed on the door. If it goes well, it can be completed in one day. At the same time, there are also the sink (which can not include the upper and lower water parts) and the gas stove. It is better to coordinate the property to pass the gas before installing the cabinet, because the gas stove needs to be tested after being installed.
9. Wooden door installation
on the second day of cabinet installation, after the wooden door measurement was completed more than a month ago, it can be installed about now. If it goes well, it is also a day. The hinge, door lock and floor suction should be installed at the same time of door installation. Students should prepare relevant hardware in advance.
If you want the wooden door manufacturer to install window frame and door, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed, at the same time, the installation time of the marble window sill should be considered to be backward wrong, after the installation of the window frame.
Note: the manufacturing cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, it is necessary to let wooden door manufacturers measure the size of door openings as soon as possible after the main body is disassembled and modified. As for the handling of the door opening, we need to pay attention to one point. If the height of the door opening in the home is inconsistent, workers need to handle it to equal height-good looking.
10) floor installation
the floor can be installed the next day after the wooden door is installed. If it goes well, it is also a day. The following problems should be paid attention to in floor installation:
1. Before installing the floor, it is best to ask the manufacturer to inspect whether the ground needs leveling or partial leveling. Some decoration companies or renovation teams will suggest students leveling or partial leveling, the actual survey of the floor manufacturer shall prevail;
2. Before the floor is installed, the floor of the paved floor at home should be cleaned, and the ground should be kept dry, so do not use water during the cleaning process.
3. When installing the floor, if conditions permit, the cutting of the floor must be in the corridor. The forum has also discussed this issue before. Some students think it is immoral to cut floors in corridors to pollute public areas. My idea is to clean it after it is finished without tightening it. Cutting the floor indoors causes serious pollution to the wall, similar to the artificial stone countertop cutting of the cabinet. I believe that many students who have decorated have experienced it.
(11) paving wallpaper
on the second day of the floor installation, after the house is cleaned up, you can arrange wallpaper paving. If it goes well, it is also a day. If conditions permit, the floor should be protected on the day when wallpaper is laid; It doesn't matter if there are no conditions. It is no problem to hand over the wallpaper glue left on the floor to pioneer cleaning. Before laying wallpaper, try to do "nothing" on the wall ".
(Twelve) radiator installation
on the second day after the wallpaper is laid, students who change the radiator or remove the radiator can hang the radiator on the wall steadily. It is also a day.
Wooden door -- floor -- Wallpaper -- radiator, this is a generally recognized correct installation sequence. The first installation of wooden door is to ensure that the skirting line of the floor can be closely connected with door set of the wooden door; the rear wallpaper is mainly because the installation of the floor is dirty and has a lot of dust, which seriously pollutes the wallpaper. The principle of "whoever gets dirty first" that I mentioned earlier is used here again. Finally, the radiator is installed because the radiator can only be installed after the Wall wallpaper is laid.
13) switch socket installation
students should have a detailed understanding or record of the number and location of switch sockets in each natural room at home, especially for those who stick wallpaper, sometimes wallpaper workers are not responsible, the wallpaper hula was spread all at once, and he didn't need to wallpaper knife to mark the position of your switch socket. Therefore, it is still necessary for students to know in their hearts.
(XIV) lamp installation
install lights, there is nothing to say. After the light was installed, the home turned on. I said goodbye to the dazzling glare of the 100-watt incandescent bulb during the decoration-it felt good.
(Fifteen) hardware sanitary ware installation
the water pipe fittings, bathroom pendants, toilets, clothes hangers, etc. bought before are all installed together. After the "big pieces" in front are installed, the home is still very "raw and cold". After the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive. It is no exaggeration to say that the first time you open the dragon water and watch the water "wow, wow" flow, your heart will be very beautiful; The first time you have a new toilet at home, you will feel a sense of accomplishment, by the way, I also gave it a good name-"Virgo".
(16) curtain rod installation
the installation of curtain rod marks the basic end of home decoration.
(17) pioneering cleaning
before pioneer cleaning, do not install curtains. Remember that the post "explaining curtains" reminded everyone. When pioneering cleaning, don't have furniture and unnecessary household appliances at home, and try to keep more "plane" so that pioneering cleaning can be thoroughly cleaned.
(18) furniture entry
as for the purchase time of furniture, my suggestion is that it should be after the renovation of the water circuit at the earliest, so that we can roughly know the basic size range of furniture. Therefore, some students are in a hurry to order all the furniture before the decoration starts, and personally feel that it is unnecessary.
(19) home appliances entering the site
at this time, home appliances should enter the site, and the installation should be ready to move in!
(20) home accessories
home accessories, the last step of home decoration, have changed from decoration to decoration, including the installation of curtains are all part of home accessories. As for buying curtains, it is best to order furniture to avoid style conflicts. Home accessories also include that you can consider buying some green plants, wall hanging painting, decoration crafts, etc...... In short, after checking in, you can play freely.