Search history
Clear allSearch by image
XDrag and drop an image here or upload an image
Max 5MB per image
UploadSign In | Join
|
g8 white simple
G8白色简配 |
CN¥ 148.0 |
|
g8 black high-end
G8黑色高配 |
CN¥ 178.0 |
|
g8 white high configuration
G8白色高配 |
CN¥ 178.0 |
|
g8 black simple
G8黑色简配 |
CN¥ 148.0 |
The G8 Creative Portable Air Pump features a novel appearance and other advantages. It also has an internal high-precision pressure sensor and a 5-stage user-friendly pressure setting operation interface. The interaction interface is: Ball, Bicycle, Car Gear, Custom Gear (0-150PSI). Users can inflate the object by adjusting to the corresponding gear, and the air pump will automatically stop inflated when the pressure reaches the system's preset pressure value, providing a safe and reliable use guarantee for users who are unfamiliar with the pressure setting. It also has a high-brightness flashlight for emergency lighting.














Update time:
TOP