Search history
Clear allSearch by image
XDrag and drop an image here or upload an image
Max 5MB per image
UploadSign In | Join
X Email Mobile
| Number | Unit-price | Total | |||
| I want to buy: | × | 16.0 | = | 0 |
A new item has been added to your Shopping Cart. You now have items in your Shopping Cart.
Zhengzhou Longxiang Amusement Equipment Manufacturing Co., Ltd 3yr.
Contacts:qinChat
Mobile:86-13526706117
E-mail:2992183296@qq.com








Product Features:



Construction base work conditions requirements: 1. Steel color base surface without dust, no loose. Loose parts after treatment can be constructed 2. The base surface shall not have water, dust, oil pollution phenomenon. If any, it must be treated before construction. 3. If the gap between steel color sheets is more than 03mm, it needs to be reinforced. Only after treatment can construction be carried out. 4. For the Yin-Yang corners, the corners of the vertical elevation walls and the horizontal corners of the vertical elevation walls, the gaps need to be treated. 5. If construction is carried out in the morning, when there is dew on the steel color sheet surface, construction must be stopped. 6. When rusty steel color is constructed, if the rust surface is more than 50, the rust on the steel color sheet needs to be removed. (Resistant to high temperature 80°C, low temperature)40°C) 7、When in contact with the cement base, the cement base is required to be solid and flat, and the base surface treatment agent is applied during construction. Construction process: 1. Clean the base surface: Use a mop to remove the dust from the color steel sheet, and if there is rust, it must be removed to achieve a smooth and clean surface. 2. Make an additional layer: Make an additional layer at the Yin-Yang corners, ventilation openings, gutter, etc. The additional layer is 15cm to 30cm wide, extending along the central axis of the Yin-Yang corners to lay. 3. Large-area construction: A: First, draw the baseline, so that the installed membrane is neat and beautiful. B: When laying the membrane, align the square membrane at the intended construction site, starting from the water flow downhill direction. The vertical wall is laid from the bottom to the top. C: Exclude the air, press the air in the membrane as it rolls, and firmly paste the membrane. D: On the nail cap of the color steel sheet, you can cut the tape into small pieces and paste it at the nail cap. For the repair of the old roof with local leakage, the local construction can be used for the pasting. E: The overlap edge of the membrane is 5cm long. F: When the membrane passes over the nail cap, it is not easy to pull the membrane too tightly, so it should be loosened, and try to make the membrane on the nail cap not too strong. 4: Local construction Targeting the color steel sheet overlap, gutter, fan, light well, etc., local construction, that is, use self-adhesive tape to paste all the color steel sheet overlap, gutter, fan, light well and other key parts, and cut the tape into small pieces at the nail cap. For the repair of the old roof with local leakage, the local construction can be used for the pasting.
Update time:
TOP