Search history
Clear allSearch by image
XDrag and drop an image here or upload an image
Max 5MB per image
UploadSign In | Join
X Email Mobile
|
|




| Hot-selling dual-sided adjustable speed manual a2 a3 a4 thermal lamination machine lamination machine price | |
| Packing Size | 54x30x27cm厘米/63x30x27cm厘米 (A3)/74x30x27cm厘米 (A2) |
| Weight | 7.5 kg/7 kg/14 kg |
| Voltage | 110/220V 50Hz 600W |
| Temperature Range | 0-180℃ |
















| Company Information |


Rui'an Chengyue Mechanical and Electrical Co., Ltd. is a manufacturer of heat press machines.
Equipped with comprehensive testing facilitiesWith strong technical strength.
Our products cover a wide range, are of high quality, priced reasonably, and feature fashionable designs.
Widely used in printing and printingProducts and industries.
Our products have received widespread recognition and trust from users, and can meet the constantly changing needs.
Economic and social needs.
We welcome new and existing customers from all walks of life to contact us to develop future business.
Relationships and shared success!



Packing Details: Carton
Port: Shanghai/Ningbo

Delivery Time:
|
Quantity (sets)
|
1 - 1
|
2 - 10
|
>10
|
|
Estimated time (days)
|
7
|
15
|
To be negotiated
|


We can ship the goods to you by sea and air. If we send the goods to you by sea, the transportation cost for bulk shipments is very low. For small orders, we can send the goods to our customers who buy planes, such as DHL, TNT, Fedex, etc. In addition, when you tell us what type of solenoid and how many pieces you want to buy, we will always let you know the freight cost. You can estimate whether you can make a profit based on the transportation cost. The shipping time is from 30 days to 45 days, and from 3 days to 6 days.Take a plane.

1. Q: Are you a factory or a trading company?
We are a factory.
2. Q: Where is your factory located?
Answer: Our factory is located in Yuhang District, Hangzhou City, Zhejiang Province, China.
3. Q: What material is your product made of?
Iron, steel, gears, heaters, 4 pcs silicon rolls, etc.
4. Q: How is the quality control at your factory?
Answer: We have always placed great importance on quality control throughout the entire process.
5. Q: How is the guarantee?
Answer: Within three months after the goods are unloaded at the destination.
Update time:
TOP