[Product Real-World Description]
316L stamping module, one-step forming; uniform stress distribution on both surfaces, maintains shape under full water pressure; hand arc welding is used between plates to prevent leakage and water leakage.
Assemble process — Argon arc full welding + sealing treatmentOn-site assembly and welding, with uniform and full welds. After welding, acid cleaning and passivation treatment are performed to restore the 316L corrosion resistance. The overall appearance features a straight body structure and neat panels, presenting a premium look. A thermal insulation layer and stainless steel outer panel can be added.
【Why choose 3.16L?】
| Project |
316L |
304 |
| Corrosion resistance |
★★★★★ (contains molybdenum, resists chloride pitting) |
★★★☆ |
| Applicable water quality |
tap water, seawater, high-chlorine water, medical water |
Standard tap water |
| Service life |
Over 30 years |
15–20 years |
| Price |
High |
Regular |
Coastal, saline-alkali areas, and the pharmaceutical and food industries – choose 316L for a more cost-effective solution in one step.
【Product Specifications Reference】
| Tonnage |
Reference Size (m) |
Plate thickness configuration |
Applicable |
| 10 tons × 2 (AB) |
3×2×2 |
1.5 mm |
Small Food Factory |
| 30 tons × 2 |
4×3×2.5 |
2.0 mm |
Hospital/School |
| 50 tons × 2 |
5×4×2.5 |
2.5 mm |
Residential community secondary water supply |
| 100 tons × 2 |
8×5×2.5 |
3.0mm+ reinforcement ribs |
Water plant / Large-scale project |
All dimensions, opening positions, and pipe diameters can be customized as required.
【Application Scenarios】
Drinking water for daily use storage / Water for food and beverage production / Purification water tanks for pharmaceutical applications / Hospital water supply / Combined fire protection and domestic water tanks / Projects in coastal and high-chlorine areas
[Regarding the AB Dual-Case Design]
▶ One in use and one standby; when one tank is cleaned or repaired, the other continues to receive water without stopping production or water flow ▶ The float valve/liquid level gauge can automatically switch for water replenishment ▶ Two pipeline configurations—series and parallel—can be implemented, with detailed drawings available
【Purchase Instructions】
-
Provide tonnage or dimensions, purpose, and installation location, and provide free proposals and quotes;
-
24 hours before production, a full-water leak test is conducted; a certificate of compliance and material report (with spectral testing available) are provided.
-
Logistics shipment / private vehicle delivery; nationwide support for on-site installation and setup;
-
2-year warranty and lifetime maintenance; supports corporate payment and invoice generation.
🏭 Original manufacturers, refusing refurbished boards and fake products! Welcome to factory inspections, online pricing available!