Welcome! Join free or Sign In

X Email Mobile

All construction is going to take place Step by Step 中文版

All construction is going to take place Step by Step

All construction is going to take place Step by Step All construction is going to take place Step by Step All construction is going to take place Step by Step All construction is going to take place Step by Step
QR code0
[Scan the QR code, view in your mobilephone.]
  • Updated: 2019-10-26 20:18
  • About Product:Step by Step is a new construction tool, the use of fast, not only to save time, improve work efficiency, but also to save a lot of wood, instead of the traditional wire binding method, Rod screw method, fixed ring plug method
EXW Price:
Above 1000pcs   CN ¥ 1 /pc
Send Inquiry
Contact
Main
Products:
Plated zinc wire,black wire,iron nail,six angle network,welding network,Net
Contacts: BillChat
Mobile: 86-13735649879
WhatsApp: 008613588687685
E-mail: 823782366@qq.com
WeChat: 008613735649879
Address: 13337 B, 2 Street, 2 F, 23 Gate, International Trade Mart (District 2).
Address: Liusu Industrial Zone, Dingzhou, Hebei




The length of tightening step by step

步步紧的详细尺寸图 
Applicable to the specific parts of the project applicable to the building model
60cm suitable for ring beam reinforcement under 30cm ring beam
70cm is suitable for brick and concrete and frame 30-35cm constructional column
Brick and concrete 80cm and frame 40-45cm constructional column
90cm brick and concrete frame with 50-55cm columns
100cm brick and concrete frame with 60-65cm columns
110cm suitable for factory buildings and high-rise buildings frame 70cm column
120cm suitable for factory buildings and high-rise buildings frame 75-80cm columns
The specific calculation method is as follows:
Example: 40cm constructional column + 5cm template (2.5cm on both sides) + 20cm square wood (10cm on both sides) = 65cm recommended model 80cm and so on
(remind the user that columns under 40cm can be strengthened directly without square wood)
The spacing between the layers of constructional columns
The size interval distance of the column
30-40 cm 45 cm
50 -- 55cm above 1.5 cm
1.5 the following 40 cm
60-65 cm, 30 cm
Recommended use of large columns over 65cm
1, clamp encryption method: more than 65 cm of the major pillars to pay special attention to the bottom of the reinforcement (i.e., 1.5 meters), according to the normal operation of 1.5 cm below the spacing should be 30 cm, now should be changed to 15 cm by post is too big a spacing, multi-purpose this layer is called encryption, encryption of this layer can be in the post photo 2 hours or line dismantled and used to reinforce the other columns, this is called the encryption method.
2. Mixed utilization method: a method based on workers' experience

(1) with step by step and butterfly buckle combined use. (2) step by step and triangle iron fastener combination. (3) step by step and steel tube combination. (4) step by step tightening rod combination. Note: although some fastener shortcomings too much face elimination situation, but step by step combined with the use of the strike column is more practical

 


                          

Click To Contact Yiwugo's Partner To Get Trade Service
©2024 Yiwugo.com All rights reserved.
Finding high quality products in Yiwu China, Yiwu China Commodity Market (Yiwu wholesale market), the World's Largest Commodities Trading Center Online.
TEL: +86-579-81530000 FAX: 86-579-85188202 网站备案号:浙ICP备15028362号-7

TOP

Items have been added to the Inquiry Basket

There are items in the inquiry basket

Continue shopping Send Inquiry